State-of-the-art digital CCTV system and complete control room rebuild for Birmingham city centre surveillance.

A complete analogue-to-digital control room rebuild achieved without a single gap in live surveillance coverage.

A critical control room required a complete digital rebuild with zero recording loss.

State-of-the-art digital CCTV system and complete control room rebuild for Birmingham city centre surveillance

Project Snapshot

Client

West Midlands Police

Location

Birmingham, UK

Sector

Public Sector

Region

ROI, NI, UK

The Project

West Midlands Police required a complete rebuild of their Birmingham city centre CCTV control room, upgrading from an analogue system to a state-of-the-art digital platform. Given the elevated security environment of the time, continuous surveillance coverage could not be interrupted during the transition, making the project technically and logistically complex.


The new system required 90 days of continuous recording capability, analogue-to-digital migration, integration with local and remote camera networks, and the ability to interface with other sites. The rebuild had to be completed within days to minimise any gap in operational capability, regardless of the complexity of the underlying infrastructure work.

West Midlands Police Control Room - UK project by Electro Automation

The Solution

West Midlands Police invested in a state-of-the-art digital CCTV system to significantly improve the quality of city centre surveillance in Birmingham.

  1. Complete control room rebuild

  2. City centre security

  3. Interface to other sites

  4. Analogue to digital upgrade

  5. Local & remote cameras

  6. 90 days continuous recording

The Result

Electro Automation built a temporary interim system and relocated the entire control room operation to provide continuous coverage while the new infrastructure was constructed. The team worked around the clock to bring the new control room fully online within days, achieving the transition without any loss of recording or control capability. The completed system provided Birmingham city centre with a significant upgrade in surveillance quality and operational capacity.

The new platform integrated local and remote cameras across the network, supported 90 days of continuous recording, and interfaced with other sites within the wider surveillance estate. The system was subsequently demonstrated to the Prime Minister during a formal visit, reflecting the confidence placed in both the technology and the team that delivered it.

Full digital control room delivered with zero interruption to surveillance coverage.

West Midlands Police achieved a complete analogue-to-digital control room rebuild without a single gap in surveillance coverage, setting a new standard for city centre monitoring.

Copy of LinkedIn Banner NEW.png

Ready To Start Your Project?

Copy of Electro Automation Presentation (1).png

Completed Projects

From secure gates and automated doors to advanced car parking systems and bespoke access control, Electro Automation Ireland delivers solutions built around your needs.

bottom of page